Connecting India's renewable energy generation to the industrial buyers who are ready for it - that's the bridge we build, every single day.

Read on

The Bridge

Why the name, and how we turn an energy requirement into a working agreement.

Industrial electricity in India is expensive, opaque, and tied to a grid that still leans on coal. Open Access changed the rules, quietly, state by state, and made it possible for a factory in Tamil Nadu to draw its power from a wind farm three districts away, on a contract written in plain numbers.

That is why we call ourselves the bridge. We source and structure solar and wind power from certified developers at competitive tariffs, then connect it to the manufacturing floors and data halls that need it. The grid carries the power. We carry the agreement.

No panels on your roof. No capital on your balance sheet. A fixed tariff for the next quarter century, signed once, indexed to nothing you don’t already understand.

How WattBridge works

What We Do

Power Aggregation

We source and structure solar and wind power from certified developers at competitive tariffs.

End-to-End Support

From matching buyer with developer to executing PPA agreements and beyond.

Industrial Focus

Specialists in HT consumers: engineering, textiles, pumps, food processing and beyond.

ESG Advisory

We help meet sustainability targets and improve ESG reporting credentials.

Value proposition

What We Offer

20–35%

Cost Savings

Potential reduction in landed energy costs through the right renewable-power structure.

₹0

Capex Required

Access renewable power without capital investment under the right procurement model.

10yrs+

Tariff Stability

Longer contract horizons to support more predictable energy-cost planning.

<50g CO₂/kWh

Lesser Emissions

Lower-emission electricity to support operational sustainability goals.

“Sustainability gets industrial buyers to the table. Cost savings is what keeps them there. Our clean power contracts consistently beat the volatility of traditional energy procurement - and the savings go straight to the bottom line.”
The WattBridge premise

Projects

Operating, commissioned, and development projects across the group.

Solar Project 01 installation

Commissioned · January 2024

Trichy

12.5 MW commissioned in January 2024.

Key facts

  • The downtime of the plant is less than 0.01%.
  • The generation has exceeded the projected value.
  • Central inverters have been used.
Solar Project 02 installation

Commissioned · July 2024

Pudukottai

12.5 MW commissioned in July 2024.

Key facts

  • The downtime of the plant is less than 0.01%.
  • The generation has exceeded the projected value.
  • Central inverters have been used.
Solar Project 03 under construction

Comissioned · 2025

Trichy II

The installation of a 2 × 25 MW solar power project has been commissioned in 2025.

Key facts

  • The voltage level of the project is 110 kV.
  • String inverter is planned for the project.
  • Exploring potential for battery storage integration.
EPC solar project installation

EPC delivery

EPC Projects

Our group companies have successfully installed and commissioned projects.

Key facts

  • Installed and commissioned 12.5 MW project.
  • 25 MW project with AC:DC ratio of 1:1.25.
  • 15 MW project with AC:DC ratio of 1:1.3.
Future solar project infrastructure planning

Future infrastructure

Other Projects

Our group companies develop future solar project infrastructure, including land procurement and grid development.

Key facts

  • Grid approval has been applied for 1,000 MW.
  • Land bank of 3,000+ acres for solar projects.

Energy Procurement Models

Two practical routes to access renewable power for high-tension consumers.

Ownership model

Group Captive Solar

Jointly own a solar plant with other consumers.

  • Minimum 26% equity stake.
  • Saves up to 40% on grid cost.
  • Tax and depreciation benefits.

Best for Units with 5 MW+ demand

Contract model

Third-Party PPA

Developer builds, owns and operates the plant.

  • You pay only per unit consumed.
  • No capital investment.
  • Contract term: 10–25 years.

Best for Any HT consumer with 1 MW+ demand

The Energy Cost Challenge

Energy is a decisive operating cost for industrial businesses.

8–12%

TNEB tariff hike

Per year

₹7.5–10

Per unit cost

HT industrial

30%+

Energy cost

Of production

Why Us, as the Bridge?

Independent advice, practical execution, and support through the life of the contract.

Independent & Unbiased

We are not tied to any single energy developer. We find the best deal for you, not us.

Success-Fee Based

We earn only when you save. No upfront fees. Our interest is perfectly aligned with yours.

Tamil Nadu Specialists

Deep knowledge of TNEB open-access regulations and local approval processes.

End-to-End Execution

From energy audit to signed agreement, we handle all regulatory, legal, and technical steps.

Fast-Track Process

Most mandates move from assessment to signed PPA in 60–90 days. Speed matters in tariff markets.

Long-Term Partner

We stay involved through the contract life with monitoring, billing, and annual reviews.

How we work

Five steps to efficient energy consumption

  1. 01

    Day 1

    Meet Up

    We understand your consumption profile, HT connection, and energy goals.

  2. 02

    Week 1

    Data Collection

    Collect three months’ EB bills, HT details, and expansion plans.

  3. 03

    Week 2

    Energy Modelling

    Deliver a detailed savings report: current cost versus our energy model.

  4. 04

    Weeks 3–4

    Developer Matching

    Match you with the best-fit energy developer from our network.

  5. 05

    Weeks 6–8

    Deal Closure

    Structure and execute the PPA, Open Access, or Group Captive agreement.

The People

Three principals. One thesis. Read top to bottom.

N.S. Manikandan

Co-founder & CEO

Origination and structuring. Spends his weeks in plants and substations. The kind of operator who learns a state’s Open Access rules by signing a contract under them.

nsm@wattbridge.in
+91 96005 56005

Coimbatore

N. Karthik

Co-founder & CEO

Project development and engineering. Translates a site survey into a bankable plan, then makes sure the plan still resembles the plant five years later.

karthik@wattbridge.in
+91 82488 63630

Coimbatore

K. Muralidhara

Co-founder & CEO

Capital and counterparties. The conversations with banks, IPPs, and consortium buyers happen in this seat. Based out of Chennai, on calls to everywhere.

murali@wattbridge.in
+91 98840 34255

Chennai

Have a project in mind? please email us or message us on contacts above.

Our Locations

Coimbatore · Head office

1, Akshaya Garden,
Police Station Road, Perur,
Coimbatore, Tamil Nadu – 641010

Chennai

1604, Amalfi,
House of Hiranandani, OMR,
Egattur, Padur,
Chennai, Tamil Nadu – 603103